Before Lime Vertical Cooling Machine Testing Inspection:


Lime vertical cooling machine is lime production line main equipment, it has function of cooling and transmission raw material and it's also the key equipment to recycle heat from active lime calcination system. After installed, you must inspection before lime vertical cooling machine testing:
1. Inner cooling machine: checking whether inner cooling machine leave uncleaned debris;
2. Casting materials and refractory bricks: checking whether casting materials and refractory brick intact or not, whether hanging tiles firm or not, whether casting materials appear covered phenomenon or not;
3. Checking whether each monitoring door strictly closed and leak out or not;
4. Discharging device: whether lime cooling machine working stable or not, whether frequency regulation reliable or not.
Inspect lime vertical cooling machine before testing is an important process of install the machine, it value for you to pay attention. Kefan machinery lime vertical cooling machine has features of simple structure, stable working, easy maintenance, etc. Strength gas-solid heat excharge making active lime cooling fast. This will not only improve the lime activity, but also improve the secondary into the kiln air temperature, recycle heat rate improved greatly.